Home
Heads:
1. Stock heads, milled to clean up surface.
2. Intake and exhaust ports matched to gaskets and ground out and blended.

Brakes:
1. New master cylinder
2. New inner and outer bearings and races
3. New wheel cylinders, lines, hoses, shoes

Suspension:
1. New lower control arms
2. New upper and lower ball joints
3. New inner and outer tie rods
4. New upper control arm bushings and sway bar bushings
5. New front and rear shocks



Next Page


3. New valve guides.
4. Manly valves, 1.94 inch intakes, 1.60 inch exhaust (triple valve grind)
5. Rocker arm pedestals were milled, drilled, and tapped for screw in rocker arm studs and guide plates
6. All new pushrods
7. All new solid lifters
8. All new rocker arms, retainers, nuts, poly locks
9. Crane dual valve springs

 
callus specs pictures